17 Feb2017
TBMs ready for Northern Line drive
The two tunnelling boring machines (TBMs) drilling the £1.2bn Northern Line Extension to Battersea have been lowered into place, ready to start their drives next month.
The two tunnelling boring machines (TBMs) drilling the £1.2bn Northern Line Extension to Battersea have been lowered into place, ready to start their drives next month.
Read Full Article: The Construction Index
Source:: TBMs ready for Northern Line drive